Demolition Noise Control: Equipment and Strategies

Dust and noise from demolition sites could disturb the lives of nearby residents. There are a variety of methods to manage these noises to ensure that both the workers and the residents are able to work in an environment that is pleasant for everyone.

In addition to filtering particles and pollutants inhaled, LEVs can help reduce noise pollution. (LEVs) will help to reduce the noise generated during demolition and construction works.

Sound Control to Demolish

There are a variety of ways to minimize the sound and disturbance that demolition works cause. The use of daylight hours during work and restriction of the use of loud machines to specific times can aid in reducing the amount of noise.

Notifying residents of the date of demolishment can let residents know in advance of what they can expect. Contractors with an established track record of compliance may assist in reducing complaints. Additionally, using more quiet equipment can reduce the the noise level during demolition. Obayashi’s Bubble Silencer for instance is a device that covers the chisel of huge breakers (heavy machines that crush cement) by forming bubbles to minimize the noise. It reduces the noise up to 5 decibels and also captures 90 percent of the dust that is generated during demolition.

Dust suppression during demolition

Eliminating dust is a crucial element of demolition because dust can be contaminated with hazardous substances like asbestos, aluminum, and crystallized silica. These substances pose a risk for workers and the residents who live nearby.

Prior to the start of work an area for demolition is thoroughly drained so that dust is not in the air. This is a very effective technique however it requires a significant amount of work to move hoses and to constantly move the hoses.

Certain solutions are more secure and effective, such as the use of a spray cannon for example, to gather dust. Bubble Silencers cut down the sound of breakers up to 5 decibels. This can be beneficial for the health of workers.

Acoustic Barriers during Demolition

Noise barriers block or absorb the sound waves that help minimize noise from demolitions. They are the most effective in areas that are near to the source of noise or within an area that is sensitive.

It is also possible to reduce sound by using equipment that reduces noise or scheduling work to periods of quiet. Also, it’s important to periodically check the level of noise and make adjustments if necessary.

Hydrodemolition for example, minimizes dust and noise when taking concrete away. The hammers in the hydrodemolition equipment don’t have to strike as hard at concrete as traditional breakers. They are therefore quieter.

Dust Control in Construction

Construction sites are always affected by dust. This is a concern in dry seasons. Dust can be a nuisance for workers but could pose health hazards. The inhalation of dust regularly can cause respiratory issues and even the death. When dust is inhaled, it could be detrimental to biodiversity and wildlife.

Teams may employ a variety ways to reduce dust in construction. They are categorized in three categories: engineering controls, administrative control, and personal protective equipment (PPE).

Engineering controls include the application of water sprays to reduce dust or the installation of exhaust vents local to equipment. Administrative controls involve adjusting the schedule of work and restricting the time and frequency. One of the best defenses against dust is PPE that includes respiratory and eye protection.

The Deconstruction Site is a pollutant control site.

Although demolition projects generate lots of noise and dust, it’s important to reduce the impact on people living nearby in the interest of complying pha nha cao tang gia re tai Ha noi with the environmental regulations. It is possible to monitor the pollution levels continuously and alter the work area according to it using an electronic monitoring device which includes dust and noise sensor.

It is also recommended to employ a reputable contractor. This will decrease the chance that your neighbour will complain.

Studies have shown that many pollutant levels aren’t measured at demolition sites. Therefore, they are not able to be evaluated at a real-time rate. The new IMS examines air pollution, vibration and noise pollution at demolition sites, to ensure they are in compliance with regulations.

Leave a Reply

Your email address will not be published. Required fields are marked *